Opes Manus Resources (OMR)

PROJECTS

Renovation, Construction, and
Retaining Wall works at Ikorodu
Lighter Terminal/Tin Can Yard, Lagos State.

Dual site project for the repair and installation of perforated sheet piles and installation of subsurface protection anodes.

Commenced: September 2020

Status: Completed july 2021

At Ikorodu, the scope of work included soil cement stabilization and the construction of a rigid pavement floor capable of storage of heavy containers and allowing for the movement of heavy equipment. At Tincan, the scope of work included Hydraulic sharp sand backfilling and rehabilitation of damaged concrete floors.